Every job below is one we do ourselves across Evanston.
We dig footings below the 42-inch frost line, set treated 6x6 posts, and frame with pressure-treated joists on 16-inch centers. From there we lay the decking, whether that's cedar, pressure-treated pine, or composite, and finish with code-height railing. Most standard decks take four to seven days depending on size and stairs.
Soft spots in the decking usually mean a joist has rotted underneath, not just a bad board on top. We pull the boards near the soft spot, check the joists and ledger for rot, and replace what's failed instead of capping it over. A wobbly railing post almost always means the lag bolts backed out or the post rotted at the base.
Faded or untreated decking soaks up water every time it rains, and that's what turns gray boards into cracked, splintering ones. We pressure wash first, let the wood dry for a couple of days, then apply a penetrating stain rated for Illinois freeze-thaw cycles. Plan on redoing this every two to three years if the deck gets full sun.
Some yards want a simple rectangle off the back door, some want two levels connected by a short run of stairs with a landing. We'll sketch the layout with you, figure out where footings need to go based on your soil, and tell you honestly if an idea is going to fight the slope of your lot.
Composite boards like Trex or TimberTech cost more up front but skip the sanding, staining, and splinters that come with wood. We still frame underneath with pressure-treated lumber, since composite decking isn't structural on its own. Board spacing matters more with composite because it expands and contracts with temperature more than wood does.
Illinois code calls for guardrails at least 36 inches high on decks over 30 inches off the ground, with balusters spaced so a 4-inch sphere can't pass through. We build railing systems that meet that spacing in wood, composite, or cable rail. If your current railing shakes when you lean on it, the posts usually need to be bolted through the rim joist instead of just screwed to the face.
If the frame underneath is still solid but the decking itself is cupped, splintering, or just outdated, we can strip it down to the joists and lay new boards without touching the structure. This costs less than a full rebuild and usually takes one to two days depending on square footage.
Joist hangers rust out, especially on decks built before stainless or coated hardware was standard. We replace hangers one at a time so the deck stays supported while we work, and we check the ledger flashing while we're under there since that's the other common failure point.
Old decks come down board by board so we can check the posts and footings before deciding whether to reuse them. We haul away the lumber and leave the yard graded and clear, ready for whatever comes next.
A lot of homeowners want part of the deck screened in to deal with mosquitoes near the lake, without losing the open part for grilling. We frame the screen porch section separately with its own roof line and tie it into the existing deck structure.
Four steps, and no surprises in any of them.
You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.
In writing, itemised, free. If something might add cost later we flag it now rather than at the end.
Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.
You point out anything you are not happy with and we fix it before the invoice, not after.
Deck installation and repair available throughout this part of the Chicago suburbs.